Regenerative Thermal Oxidizer Installation #1005 Defense Contractor located in El Segundo, CA
Another Defense Contractor updates their pollution control with the help of Alliance Corporation.
Application: Semiconductor – El Segundo, CA
Project: An 8,000 SCFM TRITON™ Regenerative Thermal Oxidizer. Installed by customer.