Archive for November 2023
Regenerative Thermal Oxidizer Installation #1005 Defense Contractor located in El Segundo, CA
Another Defense Contractor updates their pollution control with the help of Alliance Corporation. Application: Semiconductor – El Segundo, CA Project: An 8,000 SCFM TRITON™ Regenerative Thermal Oxidizer. Installed by customer. Contact Us / Request a Quote
Read MoreRegenerative Thermal Oxidizer Installation #1019 Aero-Space Application in Sylmar, CA
A Competitors Set of two 3,500/CFM Oxidizers that has been replaced by One RTO by Alliance Corporation. Application: An Aerospace Semiconductor firm, located in Sylmar, CA Project: A 10,000CFM 2-bed Regenerative Thermal Oxidizer (RTO) Replacing 2 outdated, Inefficient, Problematic competitors Oxidizers and replacing it with a single, State of The Art, High Quality KRONUS® Regenerative…
Read More
